东铁集团玉环大铁交通装备有限公司
Dongtie Group Yuhuan Datie Transportation Equipment Co., Ltd.
人才招聘
In early summer of June, the consecutive days of plum rain ushered in early sunshine on June 17, 2022, seems to indicate something? As expected, the normally calm construction site of the Yuhuan Datie Phase II of Dongtie Group suddenly became noisy. Under the leadership of infrastructure supervisor Wang Jianlin, the Yuhuan Metro management team led by Huang Chuansheng, Zhang Juntao, Yang Xiyu, Li Yihua, Wang Daqing, Li Xianbing, Zhao Qiaojing, as well as the equipment department Zhang Zili, He Zhilin, and the construction team, witnessed the start of the second phase of the construction at 8:58 pm salute. At this moment, the pile driving machine slowly started, Suddenly, with a loud bang, a section of the pile was firmly driven into the dark brown soil. Then, a long pile was lifted to its highest point and slowly lowered to align with the short pile that had already been pressed into the foundation. The construction personnel skillfully welded the two piles together, just like the Yuhuan Datie Phase I and Phase II were tightly connected.
With the full support of the group company and the personal leadership of the president, Yuhuan Datie will continue to seize the construction period, make every effort to accelerate the construction of the second phase of the project, and strive to complete it as soon as possible. So far, the Yuhuan Datie of Dongtie Group has taken root in Yuhuan. I hope that the Yuhuan Datie will produce fruitful results in this fertile land and create another Xintiandi of Dongtie Group!
+86-0576-87382851
+86-0576-89788088